Pages

Thursday, April 10, 2014

Current Progress



Currently not much progress has been made on the plans themselves, however a large amount of conceptualizing and math has been done for the necessary systems of the base. There arent really images to go with this, but basically the amount of personnel the base can hold currently has been calculated, as well as how much water and sewage they will need. Electrical is still in consideration, as this base is to be a 'spared no expense' type of place, however it will still have calculations regarding the costs.

Friday, March 28, 2014

Bunker Progress



This is the current progress of the bunker, it is rather developed however a few crucial spacing and building requirements are still missing. The components were gathered from Revitcity.com as I currently lack the knowledge on how to sculpt my own components.

Tuesday, March 11, 2014

floorplan revised

My revised floorplan

Monday, March 10, 2014

Aspect ratio from the corner in chem storage.

Friday, February 14, 2014

Hellgate Science Buidling Redesign



  

              In the redesign of the inside of the science building, it has been designed to open up more space as well as increasing classroom size overall. While Room 502 is slightly smaller, it could be used for a more advanced class. The classes have been angled in order to dissipate traffic through the main rooms. The bathrooms have been relocated to make more space, and the classrooms have more space for classes. The walls of the rooms have more odd angles rather than being designed square, which gives it more space as well as making it more visually interesting. The teacher planning space has been scaled up, as well as being given a more break room feel to the room.

Monday, January 13, 2014

Revit Components



Three
locker models for filling in the lockers of the school. They are missing the outer rim specifically so that they can be connected in the model more simply.